Diary entry · August 2026
The Mega Barn steel arrives
Foundations in, steel fabricated, and the barn arrives on site ready to assemble.
Some assembly required
In August 2026 Chris Off Roads published "The 110 Mega Barn is now on site (Some Assembly Required)". Its description says the concrete foundations were in the ground, the steelwork had been fabricated and the building was on site ready to be put together.
Chris called it a really exciting time after years of planning, noting the huge investment in the project and the work still ahead.
On 18 August the builder posted that the building was "fully loaded and ready to go".
Going up
By 1 September the builder was posting "Reaching new heights", as the frame reached "some serious height". See The Mega Barn takes shape for what happened next.